Friday, April 15, 2022

The Politecnico di Milano takes part in the restoration of the floor of the Church of the Holy Sepulchre

The Heritage-BIM detection system designed by the University

Business Announcement

POLITECNICO DI MILANO

Three-dimensional view of the HBIM model of the floor and of the laser scanner data in the area of the Anastasis Rotunda of the Church of the Holy Sepulchre. 

IMAGE: THREE-DIMENSIONAL VIEW OF THE HBIM MODEL OF THE FLOOR AND OF THE LASER SCANNER DATA IN THE AREA OF THE ANASTASIS ROTUNDA OF THE CHURCH OF THE HOLY SEPULCHRE. THE RESTORATION WORK MUST TAKE INTO ACCOUNT THE COMPLEX ARCHITECTURE OF THE BUILDING, ALSO MADE UP OF ROOMS AND UNDERGROUND STRATIFICATIONS - POLITECNICO DI MILANO view more 

CREDIT: POLITECNICO DI MILANO

The Politecnico di Milano has created the guidelines for modelling and sharing data for the project of conservation and restoration of the floor of the Church of the Holy Sepulchre in Jerusalem and has performed a detailed survey to document the state of conservation prior to the intervention.

The researchers created models of the floor and the surrounding architecture, starting from the laser scanner data. This laser scanner data was acquired by the project coordination group on site, in the midst of the pandemic (led by architect Osama Hamdan).

The high-resolution photogrammetric survey, carried out on site by researchers from the Politecnico between September and October 2021, acquired over 50,000 high-resolution images, using a system designed ad hoc.

“The system we designed,” explains Prof. Luigi Fregonese from the Department of Architecture, Construction Engineering and Built Environment at the Politecnico di Milano, “consists of a special trolley on which we engineered an articulated lighting and acquisition system, with controlled intensity and colouring. This was integrated with a topographic survey for processing and verifying the final result, a digital image, an orthophoto, with very high resolution, metrically reliable and precise, of the entire floor of the Church of the Holy Sepulchre.”

The research group from the Politecnico, MantovaLAB - HESUTECH group from the Politecnico di Milano Mantua Campus (ABC Department), which is coordinated by professors Andrea Adami, Luigi Fregonese, Stefano della Torre and the Vice Rector of the Mantua Campus Federico Bucci, worked in continuous coordination with the internal staff at the church, in order to avoid interference with normal liturgical activities and visits by pilgrims and tourists who, despite the pandemic, still filled the church every day.

The project manager for the conservation and restoration of the floor - the start of which has recently been announced - on behalf of the Custody of the Holy Land, is the Centro di Conservazione e Restauro La Venaria Reale [CCR-VR] in Turin, with the support of a multidisciplinary team, while the direction of the archaeological excavation has been entrusted to La Sapienza University of Rome.

No comments:

Post a Comment